
8
ASSEMBLY
INSTRUCTIONS
1.
Unpack
the
910Ub
from
the
carton.
Please
recycle.
2.
Verify
the
carton
contains
all
parts
from
the
list.
3.
Remove
the
short
section
of
steel
tubing
from
the
front
stabilizer
receiver
by
removing
the
two
(2)
hex
fixing
bolts
with
the
enclosed
wrench.
Discard
this
item.
4.
Thread
the
four
(4)
stabilizer
feet
(
F
‐
2
)
into
the
underside
of
the
front
and
rear
stabilizers
(
F
&
G
).
5.
Align
the
front
stabilizer
assembly
(
F
)
with
the
receiver
mounted
to
the
frame
and
loosely
install
two
(2)
sets
of
the
Allen
bolt
and
curved
washer
assemblies
(
I
‐
8
&
I
‐
9
)
through
frame
and
into
the
front
stabilizer
(
F
).
6.
Loosely
install
two
(2)
sets
of
the
Allen
bolt
and
flat
washer
assemblies
(
I
‐
8
&
I
‐
7
)
through
the
underside
of
the
frame
receiver
and
into
front
stabilizer
(
F
).
7.
Align
the
rear
stabilizer
(
G
)
with
the
frame
and
loosely
install
two
(2)
sets
of
Allen
bolt
and
curved
washer
assemblies
(
I
‐
8
&
I
‐
9
)
through
frame
and
into
the
rear
stabilizer
(
G
).
8.
Loosely
install
two
(2)
sets
of
Allen
bolt
and
flat
washer
assemblies
(
I
‐
8
&
I
‐
7
)
through
underside
of
the
frame
receiver
and
into
rear
stabilizer
(
G
).
9.
Tighten
all
eight
(8)
Allen
bolts
(
I
‐
8
)
firmly
with
provided
Allen
wrench
to
fix
the
front
and
rear
stabilizers.
Summary of Contents for 910Ub
Page 1: ...UPRIGHT CYCLE OWNER S MANUAL ...
Page 2: ......
Page 3: ...910Ub Owner s Manual 910Ub Upright Cycle Diamondback Fitness Release v 1 10 10 ...
Page 6: ......
Page 42: ......