DA 40 AFM
Operating
Limitations
Doc. # 6.01.01-E
Rev. 8
01-Dec-2010
EASA
approved
Page 2 - 21
NOTE
A list of approved equipment can be found in Chapter 6.
NOTE
For the upgrade of an airplane for Night VFR or IFR operation
it is not sufficient to install the required equipment. The retrofit
must be carried out in accordance with the requirements of
the manufacturer (see Service Bulletins) and the national
Airworthiness Authority. Any additional equipment (equipment
which is not listed in the Equipment List in Section 6.5) must
also be approved for the intended kind of operation by the
national Airworthiness Authority.
Summary of Contents for DA 40
Page 1: ......
Page 37: ...DA 40 AFM General Doc 6 01 01 E Rev 8 01 Dec 2010 Page 1 21 1 7 THREE VIEW DRAWING ...
Page 182: ...Performance DA 40 AFM Page 5 12 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Page 184: ...Performance DA 40 AFM Page 5 14 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Page 186: ...Performance DA 40 AFM Page 5 16 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Page 190: ...Performance DA 40 AFM Page 5 20 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Page 288: ...Handling DA 40 AFM Page 8 6 Rev 8 01 Dec 2010 Doc 6 01 01 E ...