DA 40 AFM
Normal Operating
Procedures
Doc. # 6.01.01-E
Rev. 8
01-Dec-2010
Page 4A - 3
4A.3
CHECKLISTS FOR NORMAL OPERATING PROCEDURES
4A.3.1 PRE-FLIGHT INSPECTION
I. Cabin Check
a) MET, NAV, mass & CG . . . . . . . . . . . . . . . . . flight planning completed
b) Airplane documents . . . . . . . . . . . . . . . . . . . complete and up-to-date
c) Ignition key . . . . . . . . . . . . . . . . . . . . . . . . . . pulled out
d) Front canopy and rear door . . . . . . . . . . . . . . clean, undamaged, check
locking mechanism function
e) All electrical equipment . . . . . . . . . . . . . . . . . OFF
f) Circuit breakers . . . . . . . . . . . . . . . . . . . . . . . set in (if one has been
pulled, check reason)
g) Engine control levers . . . . . . . . . . . . . . . . . . . check condition, freedom of
movement and full travel of
throttle, RPM and mixture
levers
h) Throttle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IDLE
i) Mixture control lever . . . . . . . . . . . . . . . . . . . LEAN
j) RPM lever . . . . . . . . . . . . . . . . . . . . . . . . . . . HIGH RPM
k) Master switch (BAT) . . . . . . . . . . . . . . . . . . . ON
l) Annunciator panel . . . . . . . . . . . . . . . . . . . . . check function (see 7.11)
m) Fuel quantity . . . . . . . . . . . . . . . . . . . . . . . . . check
CONTINUED
Summary of Contents for DA 40
Page 1: ......
Page 37: ...DA 40 AFM General Doc 6 01 01 E Rev 8 01 Dec 2010 Page 1 21 1 7 THREE VIEW DRAWING ...
Page 182: ...Performance DA 40 AFM Page 5 12 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Page 184: ...Performance DA 40 AFM Page 5 14 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Page 186: ...Performance DA 40 AFM Page 5 16 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Page 190: ...Performance DA 40 AFM Page 5 20 Rev 8 01 Dec 2010 Doc 6 01 01 E ...
Page 288: ...Handling DA 40 AFM Page 8 6 Rev 8 01 Dec 2010 Doc 6 01 01 E ...