Diamond H2O
N1022 Quality Drive / PO Box 170 / Greenville, WI 54942
Ph: (920) 757-5440 / (866) 757-9287 / Fax: (920) 757-5819
5.
CONTROL VALVE INSTRUCTIONS continued
STEP 4SS:
Use the
▲
or
▼
buttons to switch between:
•
1-99 Days Regeneration is determined by the number of days that have passed since the last
regeneration scheduled.
•
7-Day
Regeneration is scheduled for specific days of the week.
Press SET to go to Step 5SS.
STEP 5SS:
If a differential pressure switch is installed and actuated for 2 minutes:
•
A regeneration will occur immediately if no arrow points at Regen Time; or
•
A regeneration will occur at the delayed regeneration hour if an arrow points at Regen Time.
Use
▲
or
▼
to switch between the two choices. If a differential switch is not installed the settings
in this display are ignored. Press SET to exit OEM system setup.
NOTE:
A regeneration will be initiated or
scheduled after the control has received
a signal for two minutes to the DP Input
(Item A).
A. Differential pressure switch connection
B. Motor wire connection
C. AC adapter wire connection
A
B
C
OR
OR
Page 10