17
E
LECTRO
V
AP
KIT MC
Installation - Step 3
R
ECOMMANDATIONS :
All works concerned with the electrical installation must be carried out by
skilled and qualified personnel (eg electrician with appropriate training).
The customer is responsible for ensuring their suitability. Please observe
local regulations concerning the provision of electrical installations.
Check all electrical terminal screws at commissioning, after 50 hours
operation and at every service thereafter.
Take care : the KIT MC electronic components are very sensitive to
electrostatic shocks. Appropriate steps must be taken before any
operation.