![Devanco BCSI Technical Manual Installation Maintenance Download Page 23](http://html.mh-extra.com/html/devanco/bcsi/bcsi_technical-manual-installation-maintenance_2488582023.webp)
PIVIN & DRAPEAU inc.
23/27
3.8 Placards installation
:
Two rigid placards with warning signs are supplied with the operator. It is the sole
responsibility of the installer to put these placards, one on each side of the gate
where easily visible.
3.9 Electrical wirings
:
Electrical wirings and cables must be permanent and must follow all local rules and
codes.
Power supply
For size of cables required, refer to your local electrical code. For the wirings in the
control panel of the operator, refer to the electrical drawing BC14-TRS-EL (three
phases power supply) or BC14-MN-EL (single phase power supply) at the end of
this document. Once the wirings are done, check proper operation of the gate,
especially the safety edges. When activated, the safety edge must reverse the gate
movement.
The main breaker of the electrical panel on which is connected the operator must
be of at least 15 A.
Options
For all options which require electrical wirings, refer to the electrical drawings
included in this technical manual and to the installation sheets supplied with the
corresponding options.
Summary of Contents for BCSI
Page 17: ...17 27 Fig 3 1 1 Fig 3 1 2 Fig 3 1 3 ...
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......