COMMISSIONING, START-UP AND SHUTDOWN
DESMI Pumping Technology A/S
Tagholm 1
9400 Nørresundby
– Denmark
Tlf. nr.: +45 96 32 81 11
Fax +45 98 17 54 99
59
E-mail: [email protected] www.desmi.com
3. Apply oil or grease (silicone-free oil and grease, food-approved if required) on all exposed
machined parts and surfaces of the pump (with silicone-free oil and grease, food-approved if
required) to protect them against corrosion.
Observe the additional instructions.
If the pump set is to be stored temporarily, only preserve the wetted components made of low-alloy
materials. Commercially available preservatives can be used for this purpose. Observe the
manufacturer's instructions for application / removal.
Observe any additional instructions and information provided.
6.10. Return to service
For returning the pump to service, observe the sections on commissioning / start-up and the
operating limits. In addition, Do all servicing / maintenance operations before returning the pump
(set) to service.
WARNING
PERSONAL INJURY HAZARD!
Moving parts or excaping fluid could cause death or serious injury.
Immediately after the work is complete, re-install and/or re-activate all safety-relevant and
protective devices.
NOTE: If the pump has been out of service for more than one year, replace all elastomer seals.