1.
Carefully remove the cover by pulling it evenly away
from the assembly ring.
2.
Loosen the cylinder head screws un�l the assembly
ring can be turned.
Moun�ng
8
Derksen Lich�echnik
Moun�ng
8
Derksen Lich�echnik
•
Your new LED projector must be securely installed before you start using it. For assembly in the structure of your cei-
ling, you need a circular cut-out with a diameter of 224 mm.
•
Ensure that the suppor�ng structure can handle this load. It must be able to carry at least four �mes the expected load.
Informa�on about the weight of your device is provided in the technical specifica�ons.
•
The three clamps on the assembly ring ensure secure fixing in your ceiling structure.
•
Note that the electrical installa�on occurs on parts of the projector that will be under your ceiling cladding a�er moun-
�ng. This must be completed either before final assembly or via a separate access point.
4. Moun�ng and Installa�on
3.
Separate the assembly ring from the projector assem-
bly.
4.1 Moun�ng the projector
WARNING! Danger of electric shock!
An electric shock can cause serious injury or death.
▶
Only install the device once the mains supply has been switched off.