![Denver Instrument TB-124 Operation Manual Download Page 6](http://html1.mh-extra.com/html/denver-instrument/tb-124/tb-124_operation-manual_2485022006.webp)
Preparing Balances with a
Round Glass Draft Shield
• Place the shield disk on the
balance. Turn the disk
counterclockwise until it
stops and is secured.
• Place the components listed
below on the balance in the
order given:
– Pan support
– Weighing pan
– Glass draft shield cylinder
– Draft shield cover
Preparing Balances with a
Square Weighing Pan
• Place the components listed
below on the balance in the
order given:
- Weighing pan
2
Shield
Disk
Pan
Support
Weighing
Pan
Draft
Shield
Draft Shield
Cover
Shock
Absorber
Weighing
Pan