![Dentech AYRDYNE 4.0 Installation, Operation And Maintenance Manual Download Page 47](http://html1.mh-extra.com/html/dentech/ayrdyne-4-0/ayrdyne-4-0_installation-operation-and-maintenance-manual_2483474047.webp)
www.ayrdyne.com
INSTALLATION & REPLACEMENT OF THE BATTERY
45
4.4
INSTALLATION & REMOVAL
// A) REMOVING THE BATTERY BOARD
TASK
PROCEDURE
1. Ensure that the CPU and all S7-1200 equipment
are disconnected from electrical power.
2. Remove the top and bottom terminal block
covers from the CPU.
3. Place a screwdriver into the slot on top of the
module.
4. Gently pry the module up to disengage it from
the CPU.
5. Remove the module straight up from its
mounting position in the top of the CPU.
6. Replace the cover onto the CPU.
7. Replace the terminal block covers.
Summary of Contents for AYRDYNE 4.0
Page 1: ...www ayrdyne com Installation Operation and Maintenance Manual 4 0 ...
Page 6: ...4 www ayrdyne com ...
Page 10: ...www ayrdyne com SYSTEM 8 2 1 3 MAIN SCREEN OVERVIEW 2 1 OPERATION 9 8 7 10 1 3 2 4 5 6 ...
Page 16: ...www ayrdyne com SYSTEM 14 2 1 6 SETTINGS USERS 2 1 OPERATION 1a 2 3 ci cii ciii 1b 1c 1d ...
Page 18: ...www ayrdyne com SYSTEM 16 2 1 7 SETTINGS I O 2 1 OPERATION 1 3 2 ...
Page 20: ...18 www ayrdyne com SYSTEM 2 1 OPERATION 2 1 8 SETTINGS DEVICES 5 6 7 2 3 4 1 ...
Page 22: ...www ayrdyne com FILTERS 20 2 2 1 PRIMARY INFO 2 2 OPERATION 6 1 7 8 9 2 3 4 5 ...
Page 24: ...www ayrdyne com FILTERS 22 2 2 2 PRIMARY SETTINGS 2 2 OPERATION 1 8 9 10 11 12 2 3 4 5 6 7 ...
Page 32: ...www ayrdyne com AIRFLOW 30 2 3 3 VFD SETTINGS 2 3 OPERATION 6 7 8 5 9 10 1 11 2 12 3 4 ...
Page 34: ...www ayrdyne com DISCHARGE 32 2 4 1 ROTARY VALVE IF EQUIPPED 2 4 OPERATION 1 4 2 3 5 6 ...
Page 49: ...47 www ayrdyne com NOTES ...