2
Quick installation guide for RPI M50A inverters
Table of contents
1 General safety instructions 3
2 Components of the inverter 4
3 Informationen on the type label 5
4 Scope of delivery 5
5 Planing the installation 6
6 Mounting the inverter 7
7 Connecting to the grid (AC) 8
8 Connecting to the solar modules (DC) 10
9 Connecting to a datalogger via RS485 (optional) 11
10 Connecting digital inputs, EPO and dry contacts (optional) 12
11 Commissioning - basic settings 13
12 Commissioning - further settings 14
Setting date and time 14
Setting the baud rate 14
Setting the inverter ID 15
Setting AC connection type 15
Setting a power limitation 16
Setting dry contacts 17
Setting EPO (Emergency Power Off) 17
13 Technical data 18
Service Europe 20
© Copyright – Delta Energy Systems (Germany) GmbH – All rights reserved
This manual is included with our solar inverter and is intended for use by the installer and end user
The technical instructions and illustrations in this manual are to be treated as confidential and no
part of this manual may be reproduced without prior written permission from Delta Energy Systems
Maintenance technicians and end users may not release the information contained in this manual,
and may not use it for purposes not directly associated with the proper use of the solar power
inverter
All information and specifications can be modified without prior notice.
The latest version of this manual is available at
www solar-inverter com
This manual applies for solar inverter models:
●
RPI M50A_120
●
RPI M50A_122
Delta Energy Systems (Germany) GmbH
Tscheulinstrasse 21
79331 Teningen
Germany