Quick installation guide for RPI M50A inverters

General safety instructions

1

DANGER

Risk of death by electrocution

Potentially fatal voltage is applied to the solar 
inverter during operation  This potentially fatal 
voltage is still present for 10 seconds after all 
power sources have been disconnected 

 

Never open the solar inverter  

 

Always disconnect the solar inverter from 
power before installation, open the AC/DC 
isolating switch and make sure neither can 
be accidentally reconnected 

 

► Wait at least five minutes until the capacitors 

have discharged 

DANGER

Risk of death or serious injury from elec-
trocution

Potentially fatal voltage may be applied to the 
DC connections of the solar inverter  When light 
is falling on solar modules, they immediately start 
producing energy  They do so, even when the 
sun is not shining 

 

Never disconnect the solar modules when the 
solar inverter is powered  

 

First switch off the grid connection so that 
the solar inverter cannot feed energy into the 
grid  

 

Turn the AC/DC isolating switch to position 

OFF

 

 

Make sure the DC connections cannot be 
accidentally touched 

 

The solar inverter can be safely and normally operated if 
installed and used in accordance with this manual (see 
IEC 62109-5 3 3)  Delta Energy Systems is not responsible 
for damage incurred by failure to observe the installation and 
operating instructions in this manual  For this reason, be sure 
to observe and follow all instructions!

 

Installation and commissioning may only be performed by 

qualified electricians using the installation and commission

-

ing instructions found in this manual 

 

The solar inverter must be disconnected from power and the 
solar modules before any work on it can be performed 

 

The solar inverter has a high leakage current value  The 
ground wire 

must

 be connected before commissioning 

 

Do not remove any warning signs that the manufacturer has 
installed on the solar inverter 

 

Improper handling of the solar inverter may result in physical 
injury and damage to property  For this reason, observe and 
follow all general safety instructions and warnings 

 

The solar inverter contains no components that must be 
maintained or repaired by the operator or installer  All repairs 
must be performed by Delta Energy Systems  Opening the 
cover will void the warranty 

 

Do not disconnect any cables when the solar inverter is pow-
ered due to risk of a fault arc 

 

To prevent lightning strikes, follow the relevant regulations 
applicable in your country 

 

The surface of the solar inverter can become very hot dur-
ing operation  Use safety gloves when working on the solar 
inverter 

 

The solar inverter is very heavy  The solar inverter must be 
lifted and carried by at least three people  

 

Only devices in compliance with SELV (EN 69050) may be 
connected to the RS485 and USB interfaces 

 

All connections must be sufficiently insulated in order to com

-

ply with the IP65 protection rating  Unused connections must 
be closed by placing cover caps on the solar inverter 

Summary of Contents for RPI M50A 120

Page 1: ...Quick Installation Guide RPI M50A_120 RPI M50A_122 United Kingdom...

Page 2: ...13 Technical data 18 Service Europe 20 Copyright Delta Energy Systems Germany GmbH All rights reserved This manual is included with our solar inverter and is intended for use by the installer and end...

Page 3: ...eason be sure to observe and follow all instructions Installation and commissioning may only be performed by qualified electricians using the installation and commission ing instructions found in this...

Page 4: ...ove downwards in menu Set value decrease Move up Move upwards in menu Set a value increase ENT Enter Select menu item Open configurable value for editing Finish editing adopt set value OFF ON DISCONN...

Page 5: ...erter and follow the instructions contained in the manual Risk of injury from hot surfaces When in operation the housing of the solar inverter can become very hot This inverter has no transformer Info...

Page 6: ...by a roof against direct sun rain or snow Mount the solar inverter vertically Where to mount the inverter Mount the solar inverter so that the LEDs and display can be easily seen and that the buttons...

Page 7: ...82 On the left side ground the solar inverter housing Washer spring Washer M6 Screw Grounding cable Toothed ring Hang the solar inverter into the mounting plate Check that the rail of the solar inver...

Page 8: ...20 L1 N 230 VAC 20 L1 L3 400 VAC 20 L2 N 230 VAC 20 L2 L3 400 VAC 20 L3 N 230 VAC 20 AC grid voltage requirements TT is not recommended The voltage of N has to be very close to PE difference 20 Vrms...

Page 9: ...of the residual current device must not be less than the speci fied minimum tripping current Fuses When you remove the cover from the fuse sec tion protection degree is no longer IP65 Remove the cove...

Page 10: ...wered First switch off the grid connection so that the solar inverter cannot feed energy into the grid Turn the AC DC isolating switch to position OFF Make sure the DC connections cannot be accidental...

Page 11: ...on the inverter see Setting the baud rate for RS485 p 14 Communication port Connecting multiple inverters to a datalogger OFF ON DISCONN AC DC AC OUTPUT DC INPUT DC 1 DC 2 COMM OFF ON DISCONN AC DC AC...

Page 12: ...to 60 6 K4 V1 K4 Set maximum active power to 100 7 K5 V1 K5 Reserved 8 K6 V1 K6 Reserved 1 2 3 4 5 6 7 8 Dry contact 2 Dry contact 1 EPO and digital inputs VCC switch and RS485 termination resistor Dr...

Page 13: ...ect your country or grid type Country Available grids Description United Kingdom ENGLAND UK G59 3 To confirm your selection press the button ENT YES NO ENGLAND set country Are you sure to 3 If the sel...

Page 14: ...2 1 When the default information is displayed press any button to open the main menu Otherwise repeatedly press the button ESC until the main menu is displayed Inverter Info General Settings Install S...

Page 15: ...confirm your selection press the button ENT ID 001 Setting ID 5 Use the buttons and to change the value To confirm your setting press the button ENT Setting AC connection type Per default the AC conn...

Page 16: ...lephone number on the last page of this quick installation guide 0 Password 3 Type in the password you received from Delta Support Use the buttons and to set each digit To confirm a digit press the bu...

Page 17: ...To confirm your selection press the button ENT Setting EPO Emergency Power Off E Vandaag 0kWh Vermogen 0W Status Am Netz 10 Sep 2014 15 32 1 When the default information is displayed press any button...

Page 18: ...A per string Number of MPP trackers Parallel inputs 1 MPP tracker Separate inputs 2 MPP trackers Number of DC inputs total DC1 DC 2 10 5 5 Galvanic isolation No Overvoltage category 3 II String Fuse...

Page 19: ...nd Directives RPI M50A Protection degree IP65 Safety class I Pollution degree II Overload behavior Current limitation power limitation Safety IEC 62109 1 2 CE compliance EMC EN 61000 6 2 EN 61000 6 3...

Page 20: ...nverter com 0800 800 9323 call free Greece support greece solar inverter com 49 7641 455 549 Israel supporto israel solar inverter com 800 787 920 call free Italy supporto italia solar inverter com 80...

Reviews: