
103
8 Commissioning
Commissioning with the commissioning software
1
7. To set the date and time for
all inverters, click on the
Sync
time
(1)
button.
→
The message "Sync Time
successful" appears if the
setting was successful.
þ
Commissioning is now complete.
Installation and Operation Manual for Solar Power Inverter M70A EU V2.0 EN 2020-08-03