89
Installation and Operation Manual M125HV EU V3 EN 2021-07-12
9 Installing accessories
Making preparations for work - disconnecting the inverter from the mains (AC) and solar modules (DC)
11. Unscrew and pull out the wires of the AC cable.
12. Unscrew the cover of the AC cable gland and pull out the
cable with cover and AC cable gland.