9 Installing accessories
Making preparations for work - disconnecting the inverter from the mains (AC) and solar modules (DC)
Installation and Operation Manual M125HV EU V3 EN 2021-07-12
86
2. Turn both DC isolating switches to the
OFF
position.
3. Wait at least 135 seconds until the internal capacitors
have discharged.
4. Screw on the left-hand door using one of the Allen
wrenches supplied.