27
Chapter 4 Initial Startup
Chapter 4 : Initial Startup
4.1 Pre Start-up Inspection
WARNING:
2QO\TXDOL¿HGVHUYLFHSHUVRQQHOFDQFDUU\RXWWKHLQVWDOODWLRQSURFHGXUHVLQWKLV
chapter.
2. The inner high voltage of this unit is potentially fatal! Make sure the input power
has been disconnected before the following actions.
3. A startup without correctly completing
4.1 Pre Start-up Inspection
may lead to
serious personal injury or equipment damage!
Please complete all the following inspections before implementing the initial startup
procedures.
Inspection List
y
General items
___The unit has no external damage.
BBB7KHXQLWLVVWDEO\¿[HGDQGFORVHWRWKHDGMDFHQWFDELQHW
___All the installation procedures have been performed in accordance with the
instructions in
Chapter 3: Installation
.
___The pipes in and outside the cabinet have been correctly connected and the thermal
insulating layer of the pipes are free of damage and leakage.
BBB7KHIURQWDQGEDFNGRRUVKDYHEHHQUHLQVWDOOHGDQGWKHÀDWFDEOHRIWKHFRQWUROSDQHO
has been connected.
y
Environment
___The inner environment is an enclosed space and isolated from interference from
outside temperature and humidity.
___The reserved space around the cabinet conforms to the regulation (See 3.2 Space
Reservation).
y
Electronic connection
___The rated value of the input power conforms to that marked on the nameplate.
___The equipment has been properly grounded.
___All electronic connections are tight and stable.
Summary of Contents for HCH1850
Page 64: ...5013217901...