8
ASSEMBLING STA N D A N D
D U S T C H U T E TO JOINTER
M A K E C E R TAIN T H E M A C H I N E IS D I S C O N N E C T E D
F R O M T H E P O W E R S O U R C E A N D T H AT KNIFE
G U A R D (A) FIG. 13, IS POSITIONED O V E R T H E C U T-
TERHEAD.
1.
Carefully turn the jointer (A) Fig. 7, upside-down so
the table is resting on a supporting surface similar to the
two pieces of 4 x 4
lumber as shown. This will facili-
tate the assembly of the dust chute (B) Fig. 8, and stand
(C) to the jointer.
2.
Align the three mounting holes (D) Fig. 8, in the stand
with three mounting holes in the base of the jointer as
shown in Fig. 8.
ASSEMBLING B E LT
AND PULLEY G U A R D
M A K E C E R TAIN T H E M A C H I N E IS D I S C O N N E C T E D
F R O M T H E P O W E R S O U R C E A N D T H AT KNIFE
G U A R D (A) FIG. 13, IS POSITIONED O V E R T H E C U T-
T E R H E A D.
1.
Loosely thread two 1-1/4-20 x 1/2
truss head
screws (A) Fig. 10, into the two tapped holes at the rear
of the jointer table.
2.
Insert slots in guard (B) under heads of screws (A)
as shown in Fig. 11, and tighten screws to hold guard in
position.
Fig. 7
Fig. 8
Fig. 10
Fig. 9
Fig. 11
3.
Position dust chute (B) Fig. 9, as shown, over two of
the holes (D) that were aligned in STEP 2.
4.
Assemble the dust chute (B) and stand (C) Fig. 9, at
each hole (D) with a 5/16-18 x 1-1/4
long hex head
screw (E), two flat washers (F), and hex nut (G). NOTE:
Screws are to be installed upward from the base of the
jointer.
5.
Carefully turn the jointer with stand and dust chute
attached so the jointer is resting on the stand. IMPOR-
TA N T:W e strongly suggest that two people perform this
operation.
6.
Apply downward pressure on the jointer so the legs
of the stand are adjusted to the floor surface and tighten
all stand mounting hardware.
A
B
C
A
D
D
D
D
D
F
E
G
D
C
B
A
A
B