Floor Ceiling Air-Conditioning Unit
8
4.1.2 Indoor Unit Installation
(1) Determine the location of the hanger through the paper template, and then remove the
paper template.
Paper template
Anchor bolt
Fig.5
(2) Insert the anchor bolts into the drilled holes, and drive the pins completely into the anchor
bolts with a hammer.
(3) Remove the right and left side panels.
(4) Put the hanger bolt into the clasp of the indoor unit and tighten screws on the hanger to
prevent the indoor unit from moving.
(5) Reinstall and tighten the right and left side panels.
◆
Floor type
Wall
Left side panel
Right side panel
Paper template
Fig.6