Pre-configuration tasks
Once you have installed the DM5500 in the rack, cabled the DM5500 to the switch(es), and verified the VLAN configuration,
you must perform the following pre-configuration tasks before logging in to the Data Manager Appliance Configuration UI to
configure the appliance.
Topics:
•
Collect external network information
•
Collect DM5500 serial number, NTP, and time zone information
•
•
Assign static IP address to the service computer for initial DM5500 login
5
Pre-configuration tasks
37