200
Installing Blade Components
Half-Height Blades
Half-height blades support two mezzanine cards:
• Mezzanine card slot C supports Fabric C. This card must match the fabric
type of I/O modules installed in I/O module bays C1 and C2.
• Mezzanine card slot B supports Fabric B. This card must match the fabric
type of I/O modules installed in I/O module bays B1 and B2.
Types of Cards Supported
• The M710HD supports SFF and LFF mezzanine cards. x8 PCIe Gen 1
and x4 PCIe Gen 2 cards are supported.
• The M610 supports two SFF or one SFF card and one LFF mezzanine
card. x8 PCIe Gen 1 and x4 PCIe Gen 2 cards are supported.
• The M605 and M600 blades support two LFF x8 PCIe Gen 1 mezzanine
cards.
Installing a Mezzanine Card
1
Remove the blade. See "Removing a Blade" on page 145.
2
Open the blade. See "Opening the Blade" on page 149.
3
Open the mezzanine card latch by pressing the ridged area on the latch
with your thumb and lifting the end of the latch. See Figure 3-22 or
Figure 3-23.
Summary of Contents for PowerEdge M1000e
Page 1: ...Dell PowerEdge Modular Systems Hardware Owner s Manual ...
Page 56: ...56 About Your System Figure 1 21 Example of M610x Blade Port Mapping of Blade 2 ...
Page 64: ...64 About Your System Figure 1 23 Example of Half Height Blade Port Mapping ...
Page 126: ...126 About Your System ...
Page 144: ...144 Using the System Setup Program and UEFI Boot Manager ...
Page 264: ...264 Installing Blade Components ...
Page 286: ...286 Installing Enclosure Components ...
Page 308: ...308 Running System Diagnostics ...
Page 336: ...336 System Board Information ...
Page 338: ...338 Getting Help ...
Page 344: ...Index 344 V video controller installing 252 ...
Page 345: ...Index 345 ...
Page 346: ...346 Index ...