Guidelines for installing and connecting management network
cables
Use the following illustration as reference for console and management ports on the switches.
Figure 20 Console and management ports on switches
Note:
As cables are installed and connected, dress and tie cables frequently so
that excess slack does not interfere with routing of adjacent cables.
Refer to the management network cable diagrams applicable to your installation:
l
Management network A, nodes 1 - 16
Management network A, nodes 1 - 16
on page 45
l
Management network B, nodes 17 - 22
Management network A, nodes 17 - 22
on page 46
.
l
Management network B, nodes 23 - 32
Management network B, nodes 23 - 32
on page 47
.
Install Management Network I/O Cables
44
Dell EMC VxFlex Ready Node Server Installation Guide
Summary of Contents for EMC VxFlex Ready Node
Page 1: ...Dell EMC VxFlex Ready Node Server Installation Guide Rev 01 October 2019 ...
Page 6: ...Figures 6 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 8: ...Tables 8 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 16: ...Before You Begin 16 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 18: ...R640 Procedures 18 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 56: ...R740XD Procedures 56 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 80: ...R840 Procedures 80 Dell EMC VxFlex Ready Node Server Installation Guide ...