Connect and route cords and cables
Procedure
1.
Connect the power cords and I/O cables as described in documentation for your system.
2.
If the system uses a cable management arm (CMA), install it as described in the document shipped with the
CMA.
3.
If the system does not use a CMA, use the two velcro straps to route and secure cords and cables at the rear of
the system:
a.
Locate the CMA bracket slots on the rear end of both the rails.
b.
Bundle the cables gently, pulling them clear of the system connectors to the left and right sides.
Note:
Ensure that there is enough space for the cables to move when you slide the system out of the
rack.
c.
Thread the straps through the CMA bracket slots on each side of the system to hold the cable bundles.
Figure 17 CMA bracket slots
R640 Equipment Installation
36
Dell EMC VxFlex Ready Node Server Installation Guide
Summary of Contents for EMC VxFlex Ready Node
Page 1: ...Dell EMC VxFlex Ready Node Server Installation Guide Rev 01 October 2019 ...
Page 6: ...Figures 6 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 8: ...Tables 8 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 16: ...Before You Begin 16 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 18: ...R640 Procedures 18 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 56: ...R740XD Procedures 56 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 80: ...R840 Procedures 80 Dell EMC VxFlex Ready Node Server Installation Guide ...