Figure 13 Install the system in the rails
4.
Push the system inward until the lock levers click into place.
5.
Pull the blue slide release lock tabs forward on both rails and slide the system into the cabinet. The slam latches
will engage to secure the system in the cabinet.
Note:
Ensure that the inner rail slides completely into the middle rail. The middle rail locks if the inner rail is
not fully engaged.
Figure 14 Slide the system into the cabinet
R640 Equipment Installation
34
Dell EMC VxFlex Ready Node Server Installation Guide
Summary of Contents for EMC VxFlex Ready Node
Page 1: ...Dell EMC VxFlex Ready Node Server Installation Guide Rev 01 October 2019 ...
Page 6: ...Figures 6 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 8: ...Tables 8 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 16: ...Before You Begin 16 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 18: ...R640 Procedures 18 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 56: ...R740XD Procedures 56 Dell EMC VxFlex Ready Node Server Installation Guide ...
Page 80: ...R840 Procedures 80 Dell EMC VxFlex Ready Node Server Installation Guide ...