3. Engage the back end of the rail until it fully seats on the vertical cabinet flange
and the latch clicks into place. Repeat these steps to position and seat the front
end piece on the vertical cabinet flange (3).
Note
To remove the rails, pull on the latch release button on the end piece midpoint
and unseat each rail (4).
Figure 28 Installing sliding rail assemblies
Install the server on sliding rail assemblies
This procedures describes installation of the server on the sliding rail assemblies.
CAUTION
The server is heavy and should be installed in a cabinet by two people. To avoid
personal injury and/or damage to the equipment, do not attempt to install the
server in a cabinet without a mechanical lift and/or help from another person.
Procedure
1. Pull the inner slide rails out of the cabinet until they lock into place (1).
2. With the help of second person, position the server above the extended rails.
3. Locate the rear rail standoff on each side of the server and lower them into the
rear J-slots on the slide assemblies (2).
4. Rotate the server downward until all the rail standoffs are seated in the J-slots
(3).
5. Push the server inward until the lock levers click into place.
6. Press the slide-release lock buttons on both rails (4).
2U1N Configuration Equipment Installation
66
Hardware Installation Guide
Summary of Contents for EMC VxFlex Ready Node 13G
Page 1: ...Dell EMC VxFlex Ready Node 13G Hardware Installation Guide 302 002 955 REV 05 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...1U1N Procedures 16 Hardware Installation Guide ...
Page 58: ...2U1N Procedures 58 Hardware Installation Guide ...
Page 69: ...Figure 32 Install the bezel 2U1N Configuration Equipment Installation Install bezel 69 ...
Page 70: ...2U1N Configuration Equipment Installation 70 Hardware Installation Guide ...