Table 11 Management A, nodes 17 - 22 cabling
Source
Destination
Node 17 BMC (iDRAC)
Management SwitchA Port 29
Node 17 MGMT1
Management SwitchA Port 31
Node 18 BMC (iDRAC)
Management SwitchA Port 33
Node 18 MGMT1
Management SwitchA Port 35
Node 19 BMC (iDRAC)
Management SwitchA Port 37
Node 19 MGMT1
Management SwitchA Port 39
Node 20 BMC (iDRAC)
Management SwitchA Port 41
Node 20 MGMT1
Management SwitchA Port 43
Node 21 BMC (iDRAC)
Management SwitchA Port 38
Node 21 MGMT1
Management SwitchA Port 40
Node 22 BMC (iDRAC)
Management SwitchA Port 42
Node 22 MGMT1
Management SwitchA Port 44
Management network B, nodes 23 - 32 cabling
Use the following table to connect cables for the management network B, nodes 23 -
32.
Table 12 Management B, nodes 23 -32 cabling
Source
Destination
Node 23 BMC (iDRAC)
Management SwitchB Port 2
Node 23 MGMT1
Management SwitchB Port 4
Node 24 BMC (iDRAC)
Management SwitchB Port 6
Node 24 MGMT1
Management SwitchB Port 8
Node 25 BMC (iDRAC)
Management SwitchB Port 10
Node 25 MGMT1
Management SwitchB Port 12
Node 26 BMC (iDRAC)
Management SwitchB Port 14
Node 26 MGMT1
Management SwitchB Port 16
Node 27 BMC (iDRAC)
Management SwitchB Port 18
Node 27 MGMT1
Management SwitchB Port 20
Node 28 BMC (iDRAC)
Management SwitchB Port 1
Node 28 MGMT1
Management SwitchB Port 3
Node 29 BMC (iDRAC)
Management SwitchB Port 5
Node 29 MGMT1
Management SwitchB Port 7
Install management network I/O cables
Management network B, nodes 23 - 32 cabling
49
Summary of Contents for EMC VxFlex Ready Node 13G
Page 1: ...Dell EMC VxFlex Ready Node 13G Hardware Installation Guide 302 002 955 REV 05 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...1U1N Procedures 16 Hardware Installation Guide ...
Page 58: ...2U1N Procedures 58 Hardware Installation Guide ...
Page 69: ...Figure 32 Install the bezel 2U1N Configuration Equipment Installation Install bezel 69 ...
Page 70: ...2U1N Configuration Equipment Installation 70 Hardware Installation Guide ...