CHAPTER 3
Install AC Power Cables
This section provides sample diagrams and a connection table for installing and
connecting power cables to power distribution units (PDUs) and the equipment. This
information is provided as an example only, and may differ from your system setup,
depending on the number of nodes and the type of PDUs used in your system.
l
Guidelines for installing and connecting AC power cables
................................. 42
l
Sample single-phase wiring for 1U1N configuration
........................................... 43
Install AC Power Cables
41
Summary of Contents for EMC ScaleIO Ready Node 14G
Page 1: ...EMC ScaleIO Ready Node 14G Hardware Installation Guide 302 004 321 REV 01 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...Before You Begin 16 Hardware Installation Guide ...
Page 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Page 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Page 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Page 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Page 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...