3. Rotate the system downward until all the rail standoffs are seated in the J-slots.
Figure 30 Install the system in the rails
4. Push the system inward until the lock levers click into place.
5. Pull the blue slide release lock tabs forward on both rails and slide the system
into the cabinet. The slam latches will engage to secure the system in the
cabinet.
Figure 31 Slide the system into the cabinet
2U1N Configuration Equipment Installation
70
Hardware Installation Guide
Summary of Contents for EMC ScaleIO Ready Node 14G
Page 1: ...EMC ScaleIO Ready Node 14G Hardware Installation Guide 302 004 321 REV 01 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...Before You Begin 16 Hardware Installation Guide ...
Page 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Page 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Page 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Page 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Page 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...