Site requirements........................................................................................................14
Hardware acclimation times (systems and components).............................................14
Minimum configuration in single-phase power distribution cabinets........................... 20
Maximum configuration in single-phase power distribution cabinets........................... 21
Minimum configuration in 3-phase delta power distribution cabinets..........................24
Stack up for a maximum configuration....................................................................... 25
Minimum configuration in 3-phase wye power distribution cabinets........................... 28
Maximum configuration in 3-phase wye power distribution cabinets.......................... 29
Single-phase power distribution cabling (from top to bottom)................................... 44
Management A, nodes 1 -16 cabling............................................................................ 51
Management A, nodes 17 - 22 cabling.........................................................................53
Management B, nodes 23 -32 cabling.........................................................................53
Data A, nodes 1 - 22 cabling........................................................................................56
Data B, nodes 1 - 22 cabling........................................................................................57
Stack up for a minimum configuration........................................................................ 64
Stack up for a maximum configuration....................................................................... 64
Single-phase power distribution cabling......................................................................78
Management network cabling..................................................................................... 81
Data network A cabling...............................................................................................83
Data network B cabling...............................................................................................84
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
TABLES
Hardware Installation Guide
7
Summary of Contents for EMC ScaleIO Ready Node 14G
Page 1: ...EMC ScaleIO Ready Node 14G Hardware Installation Guide 302 004 321 REV 01 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...Before You Begin 16 Hardware Installation Guide ...
Page 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Page 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Page 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Page 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Page 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...