Figure 16 Installing the front bezel on 2U system'
Connect and route cords and cables
Procedure
1. Connect the power cords and I/O cables as described in documentation for
your system.
2. If the system uses a cable management arm (CMA), install it as described in the
document shipped with the CMA.
3. If the system does not use a CMA, use the two velcro straps to route and
secure cords and cables at the rear of the system:
a. Locate the CMA bracket slots on the rear end of both the rails.
b. Bundle the cables gently, pulling them clear of the system connectors to the
left and right sides.
Note
Ensure that there is enough space for the cables to move when you slide the
system out of the rack.
c. Thread the straps through the CMA bracket slots on each side of the system
to hold the cable bundles.
1U1N Configuration Equipment Installation
38
Hardware Installation Guide
Summary of Contents for EMC ScaleIO Ready Node 14G
Page 1: ...EMC ScaleIO Ready Node 14G Hardware Installation Guide 302 004 321 REV 01 ...
Page 6: ...FIGURES 6 Hardware Installation Guide ...
Page 8: ...TABLES 8 Hardware Installation Guide ...
Page 16: ...Before You Begin 16 Hardware Installation Guide ...
Page 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Page 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Page 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Page 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Page 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...