15
MAINTENANCE INSTRUCTIONS
On diagram "A" the maintenances are indicated with their terms to effect on the machine.
Not follow the scheduled terms can compromise the functionality of the machine and in this case the
warranty is not applicable.
DIAGRAM “A” SCHEDULED MAINTENANCE
FIRST
START
AFTER
10 H.
EACH
30 H.
EACH
500 H.
END
SEASON
BEGINNING
WORK
END
WORK
MACHINE Greasing
Greasing
Cleaning
Greasing
Cleaning
OIL
Put
Check level Check level Substitution
Check level
SCREWS Locking
Locking
BLADES
Check
Sharpeness
Balance
Check
Cleaning
BELTS
Check
tension
Check
tension
Substitution