5 Startup
11
DEKEMA Dental-Keramiköfen GmbH, AUSTROMAT
®
D4, Version 3, 2006
5 S
TA R T U P
5.1 SETUP
First, please ensure that the package contains all parts indicated in the list of
components (Section 1) and keep the packaging material for any later transport.
Read the operating instructions before turning on the device. In particular,
familiarize yourself with the furnace description in Section 3, and read the safety
instructions in Section 4. Before starting the furnace, remove the software module
on the back by slightly pressing together the clips on the narrow side and pulling of
the module. Store it in a safe location (see Section 7.6 and Figure 22).
Step 1
Remove the software module on the back, and store it in a safe place
(see section 7.6 and Figure 22).
Step 2
Plug in the power cable into a power socket with a ground contact.
The ON/OFF switch is on the back of the furnace.
Step 3
Make sure that the pump connected loads (rating plate) correspond to
the furnace voltage supply values.
Step 4
Connect the vacuum pump: Plug in the vacuum pump power cable
into the associated connection socket of the
AUSTROMAT D4
making sure that the guide groove is aligned. Screw tight the cable in
the socket since a bad electrical contact can damage the furnace.
Step
5
Connect the pump vacuum line (silicon tube) to the vacuum
connector on the back of the furnace.
Step 6
Turn on the furnace. The furnace performs an internal software and
hardware check and the lift moves down automatically. If necessary,
remove any ceramic dust from the lift seat and the sealing ring. Brush
the dust into a receptacle. Do not blow away the dust, and do not
inhale it.
Step 7
After it is turned on, the furnace waits approximately 30 seconds and
automatically heats up to the starting temperature of the preheating
program or the program that has been set.
TIP A
s e e p . 4 2
5.2 INSTALLATION ASSISTANT
The installation assistant is optionally activated at the plant before delivery. It is only
for special countries and customers. The installation assistant asks you to set up
the firing table and connect the pump. After pressing the NEXT key, an installation
routine runs. The firing chamber is dried, and the furnace is checked. The
installation routine takes approximately 45 minutes, and can be terminated at any
time with the CANCEL key. The installation assistant is started each time the
furnace is turned on until the entire installation routine has run once.