3.5.2 Updating controller software
3.5.3 Updating display unit software
3.6.1 Checking the protection parameters
3.7 Working through the alarms
3.7.1 Using the controllers to check the system
3.7.2 Testing the controller AC alarms
4.2.1 Checking the phase sequence
4.2.2 Checking the voltage across the breaker when synchronised
4.2.3 Checking breaker open and close wiring
4.3.4 Synchronise and close function
4.4 Customised functions and sequences
5. Final commissioning actions
5.1.1 Backing up the controller information
5.1.2 Finalising the operator's manual
5.1.3 Finalising the commissioning report
6.2.1 Troubleshooting terminal damage
GPU 300 Commissioning guidelines 4189341033 UK
www.deif.com
Page 3 of 36