Assembly Instruction
DEGERtraker
Part III
– Structure
Assembly base frame
Assembly Instruction DEGER
traker
3000NT / 3000HD / 5000NT / 5000HD / 6000NT / 7000NT / 9000NT
2012-07-01
Page III-4
Before installing the base frame, it is advisable to mark the positions of the aluminium profiles on the side of
the top cross brace and the bottom cross brace
– according to the description Part IV.
Labelling must always be from the centre of the cross brace to the outside.
1st step:
Suspend the base frame by using a crane in such a way that the bore holes at the tip of rotation of the base
frame are at the top and the connection for the Elevation motor (EMO) is on the left.
5000NT / 5000HD / 6000NT / 7000NT / 9000NT:
3000NT / 3000HD:
Weight of base frame
DEGERtraker 3000NT
217 kg
DEGERtraker 3000HD
328 kg
DEGERtraker 5000NT
383 kg
DEGERtraker 5000HD
600 kg
DEGERtraker 6000NT
650 kg
DEGERtraker 7000NT
665 kg
DEGERtraker 9000NT
675 kg
Top
down
down
Marking line
Marking line
cross brace bottom
cross brace top