PIPE(TUBE) CUTTER Of Best Technology
8
www.s-cutter.co.kr
1. Check the electric leakage breaker
Make sure the system is powered on the circuit breaker is installed.
Check if an electric leakage breaker(ELB) with rated capacity is installed in all
electric units.
Make sure that the ground wire is connected to the powered system.
2. Extension power cord
If an electrical outlet is not nearby, use an extension power cord.
Choose a proper one in terms of length and thickness, considering the flow of
electricity. If it is too long or thin, voltage increases, causing overload.
Use a short power cord as much as possible.
※ Specification of the extension cord has to be at least
×
(250V-10A).
3. Check the power
Check the power supply stated on the nameplate and use the proper power
source.
4. Check the switch is off
If an electric power cord is damaged, it must be repaired
or replaced with a new one immediately.
Unaware that the switch is turned on, the number of
accidents due to a sudden rotation of the plug is inserted in
the power being.
Instruction Before Use
Summary of Contents for S LT Series
Page 28: ...S 100LT S 150LT S 200LT...