
4096-225
3.4M & 3.7M Az/El TRUSS MOUNT
19
3.3 REFLECTOR POSITIONING
STEP 1:
STEP 2:
Bring the completed reflector assembly
to the pedestal and locate it about 1-1/2
to 2 feet away from the mast.
Make sure
that the elevation tab on the canister is
pointing towards the mast. Use the
reflector carton (or similar object) as a
rest for under the edge of the reflector.
Orient the reflector so that the cross-
tube of the center hub is perpendicular
to mast.
Mast
Center Hub
Carton
Cross - Tube
Canister
Elevation Tab
Reflector Assembly
Center Hub
DAWNco • 3340 S. Lapeer Rd • Orion, MI 48359-1320 • Ph (248) 391-9200 • Fax (248) 391-9207 • [email protected]