
4096-225
3.4M & 3.7M Az/El TRUSS MOUNT
18
STEP 3:
STEP 4:
Assemble the elevation rod by inserting
the inner strut (item 3) all of the way
into the outer strut (item 4)
Inner Strut
Outer Strut
[ 8, 9 ]
[ 9, 10, 11 ]
Struts
[ 3, 4 ]
Secure the struts with 1/2” hardware
(items 8, 9, 10, 11)
A) Run one 3/4”nut (item 16) up the
threads of the inner strut and follow
with one 3/4” washer (item 17).
B) Insert the strut through the elevation
block (item 2) and secure with 3/4”
nut and washer.
[ 16, 17]
[ 2 ]
[ 16, 17 ]
Strut
DAWNco • 3340 S. Lapeer Rd • Orion, MI 48359-1320 • Ph (248) 391-9200 • Fax (248) 391-9207 • [email protected]