Finishing steps
1. Check if the cables are connected properly (have you
connected all the cables, have you connected them to the
right place, are not the cable ends touching each other).
2. Pull back the unnecessary cable length from inside of
instrument enclosure.
3. Tight the gland nut that the cable can not be moved by
pulling.
Operating check
If the connections are appropriate, the display shows
numbers or text.
If the display shows nothing (no LCD segment lit), probable
the connections of wire not appropriate or the current do
not flow in current loop.
Check the connections and measure the voltage between
connectors 5 and 6, it must be about 2 VDC.
Assemble
4. Mount back the front cover as shown the chapter
4.3
Mounting back the front cover
.
The mounting and connecting are finished.
20180905-V1
23
Summary of Contents for DT9100 I4
Page 1: ...DT9100 I4 Intrinsically Safe Digital Clock Operating Instructions...
Page 46: ...DT9100 I4 10 2 Application example 46 20180905 V120180905...
Page 55: ...DT9100 I4 10 8 ATEX Certification 20180905 V1 55...
Page 56: ...DT9100 I4 56 20180905 V120180905...
Page 57: ...DT9100 I4 20180905 V1 57...
Page 58: ...DT9100 I4 58 20180905 V120180905...
Page 59: ...DT9100 I4 20180905 V1 59...
Page 60: ...DT9100 I4 60 20180905 V120180905...
Page 61: ...DT9100 I4 20180905 V1 61...
Page 62: ...DT9100 I4 62 20180905 V120180905...
Page 63: ...DT9100 I4 20180905 V1 63...
Page 64: ......