DT9100 I4
Preparatory steps
There are four through-holes, shown by arrows in the
following drawing, for the fastening of the housing. The
diameters of the holes are made for M3 screws.
Holes for mounting
1. Mark the places of the holes in accordance with the
drawing.
2. Make the holes ready for mounting.
3. Remove any burrs from the ready-made holes.
Please observe the safety rules throughout the operation.
20180905-V1
13
Summary of Contents for DT9100 I4
Page 1: ...DT9100 I4 Intrinsically Safe Digital Clock Operating Instructions...
Page 46: ...DT9100 I4 10 2 Application example 46 20180905 V120180905...
Page 55: ...DT9100 I4 10 8 ATEX Certification 20180905 V1 55...
Page 56: ...DT9100 I4 56 20180905 V120180905...
Page 57: ...DT9100 I4 20180905 V1 57...
Page 58: ...DT9100 I4 58 20180905 V120180905...
Page 59: ...DT9100 I4 20180905 V1 59...
Page 60: ...DT9100 I4 60 20180905 V120180905...
Page 61: ...DT9100 I4 20180905 V1 61...
Page 62: ...DT9100 I4 62 20180905 V120180905...
Page 63: ...DT9100 I4 20180905 V1 63...
Page 64: ......