background image

 

DT2500 

16 

20171220-V1 

 
 

9. Dismounting

 

 

9.1. Dismounting procedure

 

 

The following figure shows the dismounting procedures: 

Dismounting from the 
rail

 

 

 

 
The dismounting procedure needs a screwdriver for slotted screws. 
1. Before dismounting disconnect all wires. 
2. Put the screwdriver end into the fixing assembly’s hole (figure step 
1.). 
3. Lift the screwdriver handle until it possible to open the fixing 
assembly (figure step 2.). 
4. Keeping the screwdriver in this position lift the instrument bottom 
from the bottom edge of the rail (figure step 3.). 
Lift the whole instrument (you may put out the screwdriver) (figure 
step 4), the instrument will be free. 
 

 

9.2. Disposal

 

 

 

According with the concerning EU directive, the manufacturer 
undertakes the disposal of the instrument that are manufactured by it 
and intended to be destroyed. Please deliver it in contamination-free 
condition to the site of the Manufacturer or to a specialized recycling 
company. 

stop 

 

Summary of Contents for DT2500 Series

Page 1: ...DT2500 IS Power Supply Operating manual...

Page 2: ...6 3 Product description 6 3 1 Delivery configuration 6 3 2 Type designation 6 3 3 Principle of operation 7 3 4 Adjustment 7 3 5 LED indicators 8 3 6 Storage and transport 8 4 Mounting 9 4 1 General in...

Page 3: ...71220 V1 3 8 Fault rectification 15 8 1 Fault finding 15 8 2 Repairing 15 9 Dismounting 16 9 1 Dismounting procedure 16 9 2 Disposal 16 10 Appendix 17 10 1 Technical specification 17 10 2 ATEX certifi...

Page 4: ...o these personnel and put into practice by them 1 3 Symbolism used Information tip note This symbol indicates helpful additional information Caution warning danger This symbol informs you of a danger...

Page 5: ...tem components through incorrect mounting or adjustment 2 4 General safety instructions The DT2500 is a high tech instrument requiring the strict observance of standard regulations and guidelines The...

Page 6: ...ties Please take note of the instructions written in the following chapters 3 6 Storage and transport 9 2 Disposal 3 Product description 3 1 Delivery configuration Delivered items The scope of deliver...

Page 7: ...pecification Operating principle The connected line voltage through voltage transformers through the rectification and filtration come to the input of control circuit The control circuit generates dep...

Page 8: ...and transport in places whose climatic conditions are in accordance with chapter 10 1 Technical specification as described under the title Ambient conditions The packaging of DT2500 consist of enviro...

Page 9: ...as described under the title Operating conditions Mounting position The instruments are designed in housing for mounting on TS 35 rail The instruments should be mounted in vertical position horizonta...

Page 10: ...t the instrument according to the figure put the instrument s mounting hole onto the upper edge of the rail figure step 1 2 Push the instrument s bottom onto the bottom edge of the rail figure step 2...

Page 11: ...should only be grounded on one side preferably on the instrument room Make sure that the shield should be continuous between the source DT2500 and the connected device Take note of the corresponding...

Page 12: ...the polarity of the cables 1 Loosen terminal screws 2 Insert the wire ends into the open terminals according to the wiring plan 3 Screw the terminal in 4 Check the hold of the wires in terminals by pu...

Page 13: ...terminals according to the wiring plan 3 Screw the terminal in 4 Check the hold of the wires in terminals by pulling on them firmly Checking the connections Check if the cables are connected properly...

Page 14: ...manufacturer If you want smaller voltage as the nominal value you can adjust the voltage with P1 potentiometer The adjusting you should only with free output terminals 1 Turn off the device Turn off t...

Page 15: ...e instrument is defective There is no output signal check the power supply and overload indicator If the supply voltage is OK and the overload indicator is dark the instrument is defective When the re...

Page 16: ...ssible to open the fixing assembly figure step 2 4 Keeping the screwdriver in this position lift the instrument bottom from the bottom edge of the rail figure step 3 Lift the whole instrument you may...

Page 17: ...3 120 18 8 145 2726 100 0 34 300 1 15 0 11 7 15 3 50 18 8 70 1316 100 1 0 300 3 18 0 14 5 18 5 70 22 4 91 2038 50 1 0 150 3 18 0 14 5 18 5 40 22 4 58 1299 50 2 5 150 5 24 0 17 5 24 5 50 30 0 70 2100...

Page 18: ...tandard MSZ EN 61326 1 2013 Immunity Industrial area A criterion Uin 100 mV B criterion Uin 100 mV Noise emission Group 1 Class B General data Housing Terminal assembly block rail mounting on TS 35 ra...

Page 19: ...DT2500 20171220 V1 19 start 10 2 ATEX certification...

Page 20: ...DT2500 20 20171220 V1...

Page 21: ...DT2500 20171220 V1 21...

Page 22: ...DT2500 22 20171220 V1...

Page 23: ...DT2500 20171220 V1 23...

Page 24: ...DT2500 24 20171220 V1...

Page 25: ...DT2500 20171220 V1 25...

Page 26: ...DT2500 26 20171220 V1...

Page 27: ......

Page 28: ...DT2500 28 20171220 V1...

Page 29: ......

Reviews: