INSTALLATION MANUAL
3
CHAPTER 2
PRE-INSTALLATION CHECKLIST
This chapter can be used as a checklist to verify all the steps necessary to complete
installation of the PWR power supply.
1. Read all information in this manual before installation, paying particular attention
to all Caution and Warning notes.
2. Mount the PWR to the Station frame using the brackets and bolts provided in the
package. See "
.
SYSTEM WIRING: DC OUTPUT
3. Connect your devices to the PWR according to your application.
Barcode Scanners
Correctly connect the AS-I cabling to the PWR using the AS-I cable wiring instruc
-
tions for backbone and branch wiring. See "
Laser Barcode Scanners" on page 8
and
your scanner manual for details.
All cables must pass through the cable entry plate using the correct AS-I cable
grommets as described in "
and "
.
HIGH VOLTAGE: Opening the cabinet requires a key that should be used by a
person adequately advised or supervised by an electrically skilled person
to enable him or her to perceive risks and avoid hazards which electricity
can create. Internal components guarantee an IP20 degree of protection
against direct contact.
Summary of Contents for PWR-240B
Page 1: ...PWR 240B INSTALLATION MANUAL Reading Station Power Supply...
Page 25: ......