56
Electrical Installation
AccuLazr™ AL5010 Product Line Manual
Check installations using Enhanced Interface Module:
1. Plug in the power supply.
2. Check the following:
3. Power ‘on’ (POWER LED)
Trigger photoeye operation (TRIGGER LED)
Tachometer operation (TACH LED)
Serial communications, receive data
(RX1, RX2 LEDs)
Input Relay (if applicable, I/O 1 LED).
4. Finger-tighten all water-tights.
5. Install cover.
6. Tighten four Phillips screws.
Do not over tighten.
Accu-Sort Systems, Inc.
04-AL5010_Electrical_Installation_R20.doc
Summary of Contents for AccuLazr AL5010
Page 1: ...AL5010 Product Line Manual ...
Page 226: ......
Page 227: ......
Page 237: ......
Page 238: ......
Page 239: ......
Page 240: ...www datalogic com ...