gForce Ultra IOM
10
Model Identification
Inspection
This unit has been factory run-tested and has gone through a comprehensive inspection prior to its
packaging and shipment to ensure that it arrives in excellent condition. However, ship- ping damage
can occur and a visual inspection of the outer crating immediately upon delivery should be performed.
Upon arrival of the unit and before unpacking it, verify that the labeled equipment matches the bill of
lading.
Loose items such as remote-control panels, disconnect switch handles, and spare air filters are packed
inside the unit. Refer to the yellow shipping tag located on the unit door for details.
NOTE:
Any external damage or transportation damage on the freight
carrier’s forms. Inspect the unit itself for internal damage. A claim should
be filed with the shipping company if the equipment is damaged or
incomplete.
NOTE:
Freight damage claims are the responsibility of the purchaser.
Action to recover losses should be filed immediately. Please notify factory
personnel of any claims.
GU X
X
- XXX X
X
│ │ │
│
│ │
GU - gForce Ultra,
│ │ │
│
│ │
Single and Dual Circuit
──── ┘ │ │
│
│ │
│ │
│
│ │
A - Air Cooled
│ │
│
│ └ ────
W - Water Cooled
────────
┘ │
│
│
G - Glycol Cooled
│
│
│
│
│
│
D - Downflow
────────
────
┘
│
└ ────
────
U - Upflow
│
│
Nominal Kilowatts
│
036 kW
│
045 kW
│
056 kW
────────
──── ────
┘
070 kW
091 kW
125 kW
gForce Ultra Model Number
2 - 208/230 VAC
4 - 460 VAC
Voltage
Phase
3 - Three phase
Summary of Contents for gForce Ultra
Page 1: ......
Page 123: ...gForceUltraIOM_11 2022 docx...