3.
Insert the 1/4" MIT Pump Assembly into the
MIT
push to connect
4.
Open blue
JG Valve
on bottom of the MIT push to connect
5.
Use the hand pump and pump the system up to 14 psi. on the
Out gauge
(approx. 5 pumps) and let stabilize for 2 minutes
6.
If needed, pump back up to 14 psi. after stabilization
7.
Start test by closing JG Valve on bottom of the
MIT
push to connect and
remove the pump
8.
Let pressurized (14 psi.) system sit for 5 minutes and check
Out gauge
, if
you lose less than 2 psi. you have passed the MIT test
9.
If pressure loss is greater than 2 psi. check system for leaks, if no leaks are
present restart test
10.
Once MIT is completed and passed, switch
Out valve
to the
Run
position to
allow all air to drain. To return system back to normal operations see
Operations Instructions above
Clean in Place (CIP) Procedure:
1.
If Versa Fresh Pak is operating, turn off by pressing red power
Switch
and
let system drain until both gauges read 0 psi
2.
Turn
Out valve
to
Backwash
and
In valve
to
OFF
3.
Using the
Filter Wrench
loosen post filter housing and remove the post
filter
4.
Remove plug from
CIP port
(
JG Valve
connected to yellow 1/4" hose) and
insert syringe with 20 mls of Regular Clorox Bleach
5.
Open
valve
on
CIP port
(JG Valve connected to yellow 1/4" hose) and
slowly push clorox from syringe until all is inserted into the membrane
6.
Close
valve
on CIP port and remove syringe
7.
Insert plug back into CIP port, then rinse syringe with clean water
8.
Allow system to stand for 1 hour under pressure, after the hour is up refer
back to
Backwash Procedure and perform
10 Backwashes before
returning the system to normal operation
Storage:
1.
Drain unit by turning system off (press down on red power
Switch
) and wait
till gauges read 0 psi.
2.
Remove Pre-Filter and Post-Filter cartridges and discard
3.
Dry and clean filter housings as good as possible, then screw housings back
on (hand tighten only!)