5. Commissioning / Shut-down Procedure
36
OM Hydraulic aggregate, Version 1.0 01/2013
Hydraulic connection
Direct connection
Once switched off and depressurised, remove the lock nuts and plugs from the
screwed insert and fit the hose.
1
Distributor block
2
High pressure connection
3
Low pressure connection
4
Pressure gauge
Fig. 5-1
Direct connection