Page 6 of 20
2.1 Pre-Installation Responsibilities and component packing list
This document is a guide to the steps that need to be performed to correctly install
the BH200 Patient light. However, the work required to be performed is the
responsibility of the owner or designated contractor/s.
All fixings between DARAY lights and the building super-structure must be approved
by either the chief project engineer or an appropriate and competent structural
assessor.
The components supplied by DARAY for fitting / installation should be the following
items in the specified quantities.
BH200LR
Qty.
BH200LW
Qty.
12V Plug top transformer (1.8m)
1
12V Plug top transformer (1.8m)
1
Rail Clamp
1
Wall b fixings
1
Thumb Screw for Rail Clamp
1
Thumb Screw for Wall Mount
Light head and flexible arm
1
Light head and flexible arm
1
Microfibre cloth
1
Microfibre cloth
1
User Manual
1
User Manual
1
2.2 Pre-Start Checks
Please check that the power cable is without visible damage, harsh folds, knots or
cuts in the rubberised coating.
When applicable, please check that the cable is fully inserted into the power socket,
before switching the power on.
Please check that the head and all parts of the base are without visible damage.
Summary of Contents for BH200
Page 1: ...BH200 LED Patient Light Operating Installation Manual QAM BH200 0519 5...
Page 2: ...Page 1 of 20...
Page 21: ...Page 20 of 20 Service Notes...
Page 22: ...Page 21 of 20...
Page 23: ...Page 22 of 20...