P
AGE
50
46210/46220-0998 <90-00036>
Points are operated for the time periods set by switch S3 or by
programming (see OPTION and CPM POINT TIME PERIOD
commands).
Input Example:
>CPM 2 SET 1,3,5
Output Response:
>CPM 2 POINT 1 OPERATE
CPM 2 POINT 3 OPERATE
CPM 2 POINT 5 OPERATE
This example would operate control points 17, 19 and 21 (points
1, 3, and 5 of subgroup 2.
CPM POINT TIME PERIOD
Purpose:
Sets the time period for momentary operation of control points.
Format:
CPM # LONG time
CPM # SHORT time
CPM # PERIOD point number time
Remarks:
# can be a range of subgroups from 1 through 4 or the word ALL.
Here are examples:
CPM 4
Control subgroup 4 (control points 49-64)
CPM -3
Control subgroups 1-3 (control points 1-48)
CPM 2-
Control subgroups 2-4
CPM 2-3
Control subgroups 2-3
CPM ALL
All control subgroups
List point numbers individually with a comma between them, or
as a group with a hyphen between them, or use the word ALL;
range can be from 1 through 16.
Time is in tenths of seconds from 0.1 seconds to 25.5 seconds. To
specify the time, use a number from 1 through 255, each number
representing a tenth of a second.
CONTINUED
. . .
PRINTER SYNTAX