The slot coding
Illustration 42: Label on the Option Board
Installation Procedure
1.
To get access to the option slots, open the cover of the control unit.
e
3
0
b
g
8
4
8
.1
0
2.
Install the option board into the correct slot: C, D, or E.
The option board has a slot coding, because of which it is not possible to install the option board in an incorrect slot.
B
A
e
3
0
b
g
8
4
9
.1
0
A
The slot coding
B
The option slots
Illustration 43: Installing the Option Boards
3.
Close the cover of the control unit.