![Danfoss FC 100 Series Manual Download Page 17](http://html1.mh-extra.com/html/danfoss/fc-100-series/fc-100-series_manual_3792948017.webp)
2.2. Installation of Option in the Frequency
To install a fieldbus option in the frequency converter you will need:
-
The fieldbus option
-
Fieldbus option adaptor frame for the frequency converter. This frame is deeper than the
standard frame, to allow space for the fieldbus option beneath.
-
Cable holders
Instructions:
-
Remove the LCD panel from the frequency converter.
-
Remove the frame located beneath and discard.
-
Push the option into place. Two positions are possible, with cable terminal facing either
up or down. The cable up position is often most suitable when several frequency con-
verters are installed side by side in a rack, as this position permits shorter cable lengths.
-
Push the fieldbus option adaptor frame for the frequency converter into place.
-
Replace the LCD panel.
-
Attach cable.
-
Fasten the cable in place using cable holders. The top surface of the frequency converter
has pre-drilled threaded holes for attaching the cable holders to the unit.
-
If an option is installed after initial power-up the frequency converter will be tripped and
display: Alarm 67
Option Change
.
FC 100/ 200/ 300 DeviceNet
2. How to Install
MG.33.D3.02 - VLT
®
is a registered Danfoss trademark
17
2