![Danfoss ET9500 Operator'S Manual Download Page 21](http://html.mh-extra.com/html/danfoss/et9500/et9500_operators-manual_507938021.webp)
4
Transport and commissioning
4.1 Transport
The goods should be transported in the original packaging. During
transport, the goods must be secured safely within the packaging. All
applicable laws and regulations relating to securing loads shall be ob-
served during transport.
The machine may only be unloaded and transported by means of a
lift truck or a crane. When a crane is used for transport, lifting gear
with a sufficient length and lifting capacity has to be used. The lifting
gear must be attached to the lifting lug (1). For machine weight,
please refer to "Technical data" in Section 3.
Summary of Contents for ET9500
Page 1: ......
Page 3: ......
Page 34: ...3 Remount the cover plate ...
Page 40: ...If the problems with the brake continue immediately contact the manufacturer ...
Page 48: ...9 3 Electric diagram ...
Page 49: ......
Page 50: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......