Service guide
|
Disassembling and Assembling, APP 21-43
© Danfoss | DCS (im) | 2017.06
16 | 180R9121 | 521B1018 | DKCFN.PI.013.A6.02
7. Mount the three screws as shown above.
Tighten them to a torque according to
exploded view.
8. Remove the guide bolt.
Mount the remaining screws and
cross tighten them to a torque according
to exploded view.
9. Connect the pump to the rest of the
system and bleed the pump.